Highway & Transportation Bridge & Structures Pre-bid & Post-bid Engineering Field survey & Invesigation Detailed Design & Engineering Transportation & Traffic Engineering

Highway & Transportation Bridge & Structures Pre-bid & Post-bid Engineering Field survey & Invesigation Detailed Design & Engineering Transportation & Traffic Engineering

Our Services

Visit Our Project Details

  • Completed
  • On-going

Widening &Strengthening/Reconstruction to 2-Lane with paved shoulder from km 12.400 (Godda) to km 30.400 (design chainage km 30.535) (Sunderpahari) of NH-333A in the state of Jharkhand under EPC mode.

+

Widening to Four Lane rigid pavement configuration from 90.00 to km 100.800 of NH-96 (Km 42.0 to 53.300 as per new NH-330),design length of 11.300 km under EPC mode in the State of Uttar Pradesh

+

Improvement and Widening to two lanes with earthen/paved shoulder from Km 23 to Km 34.500 (11.5 Km) and overlay from Km 20.30 to Km 22.00 (1.7 Km) (Total Length = 13.2 Km) on Udaipur to Srimantapur section of newly declared NH-08 in the state of Tripura on EPC basis.

+

For Construction of 3 no. of Bypasses at Sheikhpura, Jamui & Khaira along with 1 no. of realignment at Sikandra with pre-construction activity (total length-13.472 Km) to two lane with paved shoulders standard along with Utility Shifting in N.H. 333A under EPC mode in State of Bihar

+

Widening and Reconstruction to Two Lane with Paved Shoulder/ Two Lane + Paved Shoulder with service road from km 98+000 to km 176.310 of NH-320G in the State of Jharkhand under EPC mode.

+

Construction of bypass around Lohardaga town of NH-143A in the state of Jharkhand under EPC mode.

+

Improvement/ Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from Daili to Kuraopokpi section (Pkg-4B) of Imphal Kohima Road (NH-39) (Design Chainage from Km 274+610 to Km 287+000) in the state of Manipur on EPC Mode.

+

Four laning of Demow (534.800) to End of Moran bypass (Km 561.700) of NH-37 including Emergency Landing Facility (ELF) the state of Assam under on EPC Mode.

+

Widening and strengthening/reconstruction of existing pavement to two lane with paved shoulder from km 116.000 to km 176.220 (except km 155.00 to 156.00, km 160.368 to 161.368, km 164.500 to 165.500 and km 168.800 to 169.800) of NH 75-E (new NH 20) along with shifting of all PHED and Electrical utilities in the State of Jharkhand on EPC mode. (Job No.-NH-75E-2021-22-JHR-307).

+

Construction of one Flyover at km 2+735 and one Major Bridge at km 31+260 on NH-730 in the state of Uttar Pradesh under EPC mode.

+

Construction of 4 Lane Elevated Viaduct At km 7+030 to 8+890 including construction of 4 Lane Flyover from km 7+080 to 8+890 (Munshipulia Chouraha) including RE Wall, Retaining Wall & Approaches on NH-24A.

+

Construction Of New High Level RCC Major Bridge at existing location of Old Bridge Across Chir River in KM 199 on NH 333A and its approaches having an aggregate length of 700m 350m on both side in district banka in the state of Bihar on EPC Mode.

+

Widening & strengthening of road to 2-lane with earthen shoulders in km 36.100 to 60.600 (Dumri- Kurud more) of NH-143B on EPC Mode for the year 2021-22 under NH Division , Gumla in the state of Jharkhand.

+

Construction of new 6 Lane VUP including approaches comprises the section of NH-23 (New NH-143) commencing from km 245+545 to km 246 330 and construction of Foot Over Bridge @ 246+760 of Brahmani bypass end-Rajamunda Section of NH-23 (New NH -143) in the State of Odisha.

+

Widening of 2-lane to 4-lane in Ch 155+100 to 160 + 700 km from ISBT to Railway crossing of NH-72 (new no-NH7) in Distt - Dehradun in state of Uttarakhand (under EPC mode). Authority: PWD (NH), Contractor: Rakesh & Co., Year: 2021.

+

Construction & Upgradation to 2-lane with paved shoulder from Design Km. 67+805 (End of 83rd km Tuunel) to Km 80+675 (Start of Kistwar Bypass) of 12.870 Km length on Khellani – Kishtwar – Chattroo section of NH-244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg. –III).

+

Construction of two lane with paved shoulders road of Tamenglong Mahur section in Manipur from km 20.500 at Old Tamenglong to km 30.800 ending near Phelong (Length-11.0 km) (PKG-3) on EPC mode.

+

Detailed Engineering of Widening/ Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 88.000km to Ch.99.930 km of the Sagunbashi forest (near Nichinta) Bypass to the starting of Krishnai Bypass Section (Package-7) of Bilasipura- Guwahati road of NH-17 in the state of Assam on EPC mode.

+

Construction of 4-lane ROB & its approaches in replacement of existing RUB (Rly. Km. 31/22-24) between Bhedia & Bolpur at Bhedia at Km 41.760 of NH-2B in the State of West Bengal. Job No. NH- 2B/(WB)/(17)/15-16-014-S&R(B).

+

Construction of 2 number Minor bridges at 190+729 km (Bamnijhora) & 190+878 (dakuwajhora) km of NH31C near Alipurduar in West Bengal under EPC mode.

+

Construction of 2-Lane with Paved shoulder of NH108B of Agartala-Khowai section (Package-II) from Ch. 19+300 to 31.300 km in Tripura (EPC mode)

+